Preparation before the concrete mixing plant disassemble
Writer:Admin Time:17/10/23In the demolition of concrete mixing plant, to conduct a comprehensive inspection of the unit by the technician for the use of the equipment operation situation and the system, and make a record, take practical measures, eliminate security risks to avoid accidental damage during removal.
Dismantled before the maintenance: in order to ensure the install again to normal operation, the batching plant equipment must be dismantled before the overall cleaning and oiling maintenance, ensure the lubrication of machinery in place, ready to move.Generally need to check the main parts: host powder discharging door, shaft end in the operation of lubrication, host discharging door, cement silo, and screw machine with and without fly ash storehouse, Chen discharging mouth of the power house for metrology according to the discharging port and the discharge valve, batching machine discharging mouth, station appearance etc.
Working site: the site of subgrade needs to satisfy crane operation demand, ready mixed concrete mixing plant will affect the demolition work around the materials and facilities need to be cleared in the official before disassemble. Ensure the construction site without obstacles, there is enough space for disassembly work.