The Using Methods Of Concrete Mixing Plant

Writer:Admin   Time:16/01/26

     The sequence of cheap concrete batch plant starting  :

    Firstly, the control switch which includes the main engine, the cement silo, the pump, the mixing chamber, the flat belt, the inclined belt, and the discharge switch in the motor cabinet should be opened. Then it should open the computer host. After opening, firstly it should test the mechanical movement capacity. The first is to operate the diagonal belt, and then run the host, and finally to run flat belt. It can guarantee that the inside scrap can work out and maintain the mechanical integral movement. If in the case of normal operation, you can open the pump, batching plants concrete and so on. Thus the machine began to work properly. If the starting sequence of some of the equipment is not right, it also means that there is no normal start. It will cause damage to the device for long time, this situation is to resolutely put an end.
     
    The concrete mixing plant on power up and power off is a necessary process. The reasonable and safe operating concrete mixing plant not only can reduce the accident, but also can ensure the service life of the concrete mixing plant. So the station master should plan for the work flow which the operator can operate the concrete mixing plant safely so as to ensure the smooth production.