Haomei Machinery > Haomei News > Views
The Curing Of Concrete Mixing Plant HZS60
Writer:Admin Time:15/08/31Concrete mixing plant normal operation should pay attention to the usual maintenance work.
1, 60 square checked before each use small concrete mixing station
Check the concrete mixing station compressor captive device is reliable, the pressure is stable; check whether to add a little water pumps, pipe is smooth; Doumen silo, cement Doumen, intermediate hopper door, the door opened and closed whether material flexible and reliable; check Mixer blade coupling bolt is solid; check the electrical device is safe and reliable operation of the limit switch each switch is flexible and reliable; check the gear box lubrication point anxious whether there is enough oil.
2, class after use and maintenance
Clean up inside and outside concrete mixers, the plot material feeding door and rinse; filling the lubrication points lubrication points, especially the shaft seal, must not be missed; winter liquid water should be placed within the road; exhausted air compressor reservoir gas and water within the pump; after the shutdown of all switches in the non-operating state, and power off.
3, weekly inspection and maintenance
Check stirred tank residual concrete plant in india condensation and, if condensation should be shut down for the Eradication (note should cut off the power supply specialist care), check the stirring blades and liner gap, if not suitable for adjustment; check the pneumatic system for leaks, cylinder moves reliability; check box deceleration lubricant quality and liquid level, if necessary, raise or replace; check water supply system in the bottom valve is reliable; check whether the electrical components appear damaged, if necessary, repair or replacement, inspection Each connection is loose; tighten open the blockage, check the shaft seal case, screwed into place after the blockage without exception.
4, surrounded inspection and maintenance
Check the belt tension concrete mixing station the situation and make appropriate adjustments; check blades, wear liner; connecting bolt check the upper and lower racks, bins, large inclined belt conveyor and other components are secure, whether under ground Shen; check concrete mixing station equipment - whether there are lumps and debris inside the screw conveyor, if it is cleared.
5, each year 60 square small concrete mixing station inspection and maintenance and overhaul
Concrete plant run running year, in addition to 1,2,3,4 inspection items, but also to deal with other parts inspection, conduct a comprehensive inspection, maintenance and replacement.