The Load Test Of Concrete Mixing Plant

Writer:Admin   Time:16/05/17

     The concrete mixing plant load test

     
    Unit debug everything is normal, then the load test, and after first manually. Machine load test following boot sequence: air compressor → mixer → original aggregate belt conveyor belt conveyor → mix cement screw conveyor governor spiral machine →pellet the belt weighing → powder Electronic spiral scales machine → water supply system.
     
    Concrete Mixing whole load commissioning
     
    Everything is normal load test, load test, and automatically after the first manual, the first unit load trial run, after the whole load commissioning.
     
    Commercial concrete mixing plant commissioning work mainly composed of four parts: commissioning preparation work unit commissioning, machine load test, the whole load trial run. The following is a detailed description of each part:
     
    The most important is commissioning preparation work before load test.
     
    Commodity mixing plant?part with the main models introduced device debugging, check the following components:
     
    (1) Check the various parts of the fastening reliable connection, especially to check the mixing blades in the concrete mixer and stir shaft connecting bolts are tightened, the new machine should be re-tighten the check again.
     
    (2) Check the lubrication of the various parts, to ensure the lubrication point lubricant (grease), the gear box and electric drum oil level is within the requirements.
     
    (3) Check the concrete batching machine console and electrical cabinets connected to each connector wrong access bobble.