     How to install a concrete mixing plant?

    First, the installation of concrete mixing plant conveyor belt conveyor

    Will be finished product belt conveyor, from bending after framework on the basis, framework, then before and after leg good connection with conveyer, brace and rack lug connection is good, then the front of conveyor lift, fitting of front and rear leg and brace, finally will leg before and after the anchor bolts.

    Second, The installation of batching plant host and batching system

    Lift the mainframe rack, on the basis of its feet bolts fastening.

    Third, the installation of finished storage hopper

    Will be finished storage hopper lifting, legs will stand up, will walk Taiwan, ladder and finished material storage hopper connected.

    Forth, the installation of batching system

    To lift batching system on the basis, connect the flashboard is good, pack up heightening plate connected to the board on both sides, then the original aggregate conveyer, connect the front and rear frame, make the electric drum mixer hood hole center, finally will anchor bolts. 

    Fifth,installation of cement warehouse.The cement warehouse components in the ground one by one assembly, lifting the cement warehouse, and the lower side of the body bracket less side of the direction towards the powder ingredients system, fixed up and down the warehouse, and finally fixed anchor bolts.

    Then, the installation of the screw conveyor
    Lifting the screw conveyor, the screw conveyor ball hinge and cement warehouse outlet connection, so that the discharge port on the powder hopper feed mouth, and then use the rope to the conveyor and cement warehouse hanging ear connection, and finally to the ground feet bolts fixed.
    And lift the pump in the right place, connect the output water pipe.

    Finally,put air compressor of concrete mixing plant iinto hopper side, the air compressor with tracheal exports and pneumatic tank inlet connection is good, the gas control box exports to the cement warehouse broken arch of the trachea connected.