Haomei Machinery > Haomei News > Views
What Should Pay Attention To Installation Of Concrete Pump ?
Writer:Admin Time:16/02/29When installing a commodity concrete pump to consider the source of the commercial concrete.If is commodity concrete mixing transporter feed, so pump can be installed in situ, as long as convenient take over and feed.If mixing concrete products is the spot, it shall be according to the venue and mixer feeding way to determine the location of the mixer, and then according to the height of the mixer discharge and suitable for pumping and to take over the request to determine the location of the commercial concrete pump.In particular the installation steps need to be done according to the following five steps:
Goods will be placed on a solid concrete pump concrete floor or pier, to maintain the level and pump four leg lock pins and safety pins, remove the tire or tires off the ground.
2, the shutter
According to the discharge port and the pump hopper mixing machine to make a chute so that the mixer discharged into the hopper feed pump through the chute.
3, the support
Usually chute angle as skeleton, with 1.5 mm thick steel plate welded together. Here chute set up with support, to make it secure.
4, chute
Usually, on the hopper of pump need heightening 20 centimeters, so that increase the bucket capacity, to ensure the commercial concrete won't drain.Because forced mixer unloading a best finish unloading, which flow into the hopper of the concrete products a more even coating.
5. Through the above steps, commodity concrete pump that is installed after the installation Throughout the whole place to ensure that the mini concrete pump truck casing door switch freely, for maintenance operations.