Tips: Concrete Batching Plant Foundation Selection Techniques
Writer:Admin Time:16/01/13When installing a station, there are a lot of is must pay attention to details, such as concrete batching plant turkey under construction before the foundation of construction and the choice is work center of gravity.
First of all, the basis of the level of mixing station must be level meter and a super flat cytometry. Concrete mixing station according to drawings ready embedded iron, embedded iron can not arbitrarily change the size, please contact the venue change technical guidance personnel must be notified to make written proof. Requires mixing plants need to lay the foundation in steel mesh, steel anchors are not less than the required size of the drawing; the depth and width of not less than the required foundation excavation drawing the desired size. Not free to change the size indicated on the drawings, if any changes need to inform site technical guidance personnel, to make written proof.
Secondly, according to technical requirements the feeding station, to find a good benchmark, size error between the two basis shall not be greater than 50 mm, with lime out the center of the base and the mining base size limits.Mining qualified after pouring concrete foundation, need to secondary pouring must be secondary pouring.Mining base, with reinforced or peg based the centerline position of the reserved, labeling requirements clear, two of the same basic embedded iron centerline position to be in the same line, deviation shall not be greater than 20 mm.Embedded iron was placed before pouring completed must be kept with ground plane level and above and the adjacent embedded iron levels, parallel, and concrete batching plant can not have torsion Angle, the phenomenon of deviating from the center.