Three Stages Easily Affect The Productivity Of Concrete Batch Plant

Writer:Admin   Time:16/07/15

     

    We specialize in manufacturing concrete batch plant for many years, the machinery have been sold to many different countries, such as Malaysia, Turkey, Dubai, Uzbekistan and so on. To know about many customer in addition to care about the price of the station, the most concerned about the productivity of concrete batch plant, under the unified for everyone here says three factors that influence efficiency of producing concrete mixing station, let the user know what to do to be effective capacity of the concrete batch plant.

    1, Concrete batch plant , the influence of the feeding time,mixing time and discharge time

     
    Users in the process of using butterfly valves should be inspected regularly and related electrical components, guarantee the smooth operation, powder hopper and mixer are the connection between the unobstructed, ensure feeding
     
     
     
    For the mixing time, the user should check the soundness of internal blade mixer liner, feed delivery location, delivery time, if there axle phenomena affect the stirring effect and time; time for the material,
     
    Commonly used to increase the hopper capacity of concrete or concrete hopper designed to store the containers to reduce the discharge time.
     
    3, Concrete mixing plant manufacturers transportation equipment
     
    Users should according to the batching plant production ability and the transport distance, equipped with enough transporter, unapt too much concrete can not get timely transport, affect the progress of the project.