Haomei Machinery > Haomei News > Views
The Raw Materials Control Of Concrete Batching Plant
Writer:Admin Time:16/06/02The main raw material is cement concrete mixing station.So, as a concrete batching plant management, how to prepare for raw materials in the daily management of the control is very important.
Managers must understand in detail the basic parameters of concrete, batch concrete plants to reach production of concrete strength requirements specified level. Workability of concrete is a comprehensive technical nature, the workability of a direct impact on the construction and strength grade concrete.
First, cement approach must be examined before use, must have related factory certificate and test report.
Second,On storage time longer, cement must be advanced test, usually a cement from the factory began more than three months was regarded as overdue.
Three , at the different time of making the finished product of cement don't mix use, for the same varieties of cement, strength grade is different or is not the same as the delivery date can not mix, as a manager to keep in mind the above rules.
- Previous:The Use Of Concrete Batching Plant Parts...
- Next:The Configuration Of Concrete Batching Plant...