How to install concrete batching plants correctly
Writer:Admin Time:17/08/08How to install concrete batching plants correctly?
1, the installation of finished product tape conveyor will be finished material conveyor belt from the bend to start the rear frame on the basis of the connection before and after the framework, and then the front and rear legs connected with the conveyor, And the rack on the hanging ear connection, and then lift the front of the conveyor, connecting the front and rear legs and bracing, and finally the front and rear legs of the anchor bolts.
2, stir the mixing host and powder ingredients system installation lifting the host frame, on the basis of its anchor bolts to fasten.
3,Finished product storage hopper installation will be finished product storage hopper hoist, the leg up, will walk, ladders and finished product storage hopper connection is good.4,The preparation of the pelletizing system is carried out on the basis of the above, the board will be connected, and the two sides will be put on the sides and the board will be connected with the card, and then the original aggregate conveyor will start, After the rear rack is connected, the electric drum is aligned with the center of the concrete mixer head hole, and finally the anchor bolts are tightened.
5,let cement silo parts which are assembled on the ground, lift cement silo, and toward the side of the capsule stents under lateral brace less powder batching system, fixed capsule, finally fixed anchor bolt.
6,Lifting the screw conveyor, the screw conveyor ball hinge and cement warehouse outlet connection, so that the discharge port on the powder hopper feed mouth, and then use the rope to the conveyor and cement warehouse hanging ear connection, and finally to the ground Feet bolts fixed.
7,The lift pump in the right place, good output pipe connection.