How to build a concrete batching plant

Writer:Admin   Time:17/09/22

     How to build a concrete batching plant,do you know the way to build the batch plant?The China professional batching plant manufacturer tell you these.

    A project can be set up only one concrete batching plant, can also be set by the concrete mixing station or set up a large batch plant coupled with the right amount of concrete transport vehicles; specific to the actual situation.

    First of all,concrete mixing plant mixing host and feed ingredients system should be based on the duration of the project, the total amount of concrete, daily concrete dosage and other indicators to configure to meet the maximum amount of concrete is appropriate; a concrete mixer and related into the ingredients system for a production line; The general project can only set up a production line, the larger and important projects should be set up two production lines, side by side arrangement to ensure uninterrupted supply of concrete for the project.

    Second, the pile field area should be large enough, can satisfy the engineering consumption needs, and can be convenient organization feed supplement;Sand partition stacked to prevent mixing concrete grading is not;Equipped with feeding and sand were neatly stacked loading car;Site to hardening, convenient wheel loader charging and prevent dirt and other debris into the material.

    Again, a concrete mixing station with 1-2 pools, to be able to ensure that the concrete mixing plant and mechanical cleaning required. A production line with at least 2 to adapt to the cement warehouse, preferably for the three, take turns to use in a timely manner to meet the needs of concrete production without cement backlog. Large volume and pumping concrete is generally mixed with fly ash and admixture, according to the scene were placed to facilitate the use of appropriate.

    Finally, as for the way to transport finished concrete, you can use trailer concrete pump mode. The delivery method to meet the transport distance and height and the supply of concrete as the basis, generally arranged in the cement mixer before the pump pipe connected to the pouring; can also be arranged near the place of pouring, with concrete conveyor to the pump.