Writer:Admin Time:24/05/23Want to know how to build a concrete batch plant, we need to understand the whole process first, including what formalities are required, what is the process of building the concrete batch plant, what matters need to be paid attention to, what are the requirements, and what is the overall investment cost. These are the early understanding of the how to build a concrete batch plant, but also some of the questions that users often ask.
The whole process of how to build a concrete batch plant, including site selection, planning, construction, equipment purchase and other aspects, the following is a basic process:
1, Pre-planning and design:
Determine the size of the mixing plant, capacity, equipment selection, etc..
According to the site selection for site planning and layout, including site leveling, road paving, drainage system, power system, etc..
Design the production flow of the concrete mixing plant, including feeding, batching, mixing, discharging, etc.
2, Equipment procurement and installation:
Procure the core equipment of the concrete batching plant, such as mixing host, material weighing system, material conveying system, water supply system, etc.
According to the size and weight of the equipment, formulate an installation plan, use car cranes and other equipment to lift the pillars, main engine, cement tanks, belts and other components to ensure that each piece of equipment is installed in place.
3, Infrastructure construction:
Carry out foundation excavation according to the planning requirements, reinforce the foundation, and carry out bearing capacity test and inspection to ensure the stability of the foundation.
The foundation of the mixing machine is discharged, reinforcing bars are made, formwork is installed, concrete is poured, and ground bolts are pre-buried, and other processes are carried out.
After completion of pouring, carry out maintenance to ensure that the concrete reaches the design strength before dismantling the mold.
4, Equipment commissioning and test run:
After the equipment installation is completed, carry out debugging and trial operation to ensure that the equipment operates normally and the systems work in a coordinated manner.
During the commissioning process, pay attention to checking the parameters such as metering precision and mixing time to ensure that the process requirements are met.
5, Environmental protection and safety measures:
Install dust removal equipment to collect and dispose of the dust generated during the mixing process to protect the environment.
Equipped with necessary safety facilities, such as guardrails, warning signs, etc., to ensure safety in the production process.
6, Personnel training and operation:
Train the operators to familiarize them with the operation, maintenance and repair methods of the equipment.
Formulate operation regulations and safety production system to ensure standardized operation and safe production in the production process.
7, Operation and Maintenance:
During the operation of the concrete batch plant, regular maintenance and repair of the equipment is carried out to ensure the normal operation of the equipment.
Regular inspection and maintenance of equipment, timely detection and treatment of equipment failure.
8, Optimization and improvement:
According to the actual situation in the production process, optimize and improve the concrete batch plant to improve production efficiency and product quality.
Introduce new technology and new equipment to improve the automation level and intelligentization level of the mixing plant.
The above are the basic steps of how to build a concrete batch plant, and the specific steps may vary according to the actual situation. In actual operation, it should be adjusted and optimized according to the specific situation.