How much is the concrete batching plant mixture ratio

Writer:Admin   Time:17/04/17

     Some customers will ask this question: How much cement, sand, bricks and water is needed for 1 square metre of brick work when using concrete batching plant.

    Batching plant manufacturer tell you that each construction site according to their own needs to do their own test after the formula.


    In general, different types of concrete formulations are not the same.

    We are profession concrete batching plant manufacturer ,supply all models of it more than 15 years.

    Here you can give you the concrete mix ratio refers to the concrete composition of the material (cement, water, sand, stone) between the proportion of the relationship for your reference.
    There are two ways to express: one is 1 cubic meter of concrete in a variety of materials, such as cement 300 kg, water 180 kg, sand 690 kg, stone 1260 kg; the other is the quality of cement and a variety of materials The ratio of the amount and the water-cement ratio of the concrete. For example, the former example can be written as: C: S: G = 1: 2.3: 4.2, W / C = 0.6.
    Common level
    C20
    Water: 175kg Cement: 343kg Sand: 621kg Stone: 1261kg
    The ratio is 0.51: 1: 1.81: 3.68
    C25
    Water: 175kg Cement: 398kg Sand: 566kg Stone: 1261kg
    Match ratio: 0.44: 1: 1.42: 3.17
    C30
    Water: 175kg Cement: 461kg Sand: 512kg Stone: 1252kg

    Match ratio: 0.38: 1: 1.11: 2.72