Concrete mixer for 50m3 concrete batching plant

Writer:Admin   Time:20/02/12

    The 50m3 concrete batching plant, also known as hzs50 concrete batching plant, occupies less capital than a 60m3 ready mix plant. It is an ideal equipment for bridge construction, road engineering, construction sites, and construction companies. HZS series concrete mixing plants are our flagship products. Compulsory and high-efficiency, they can produce various types of concrete such as plastic, dry and hard concrete, widely used in large and medium-sized building construction, road and bridge engineering, and prefabricated factories. The main unit of a 50m3 concrete batching plant adopts JS1000 series double horizontal shaft forced mixer.

    The JS1000 concrete mixer adopts Shigaoma double horizontal shaft forced mixing host. Through industrial control microcomputer control and electronic scale measurement, the measurement accuracy is high and the error is small. With screen display, ratio storage, dynamic zero tracking, automatic drop compensation, production management, physical consumption and statistics, printing and monitoring functions, can realize manual and automatic control of the mixing process. It has the advantages of reasonable structural design, safe and reliable operation, good quality of mixed concrete, fast speed and accurate measurement. It is an ideal choice for construction, hydropower, highway, port, bridge, airport, prefabrication plant and commercial concrete production plant.

    The abrasion-resistant materials for the concrete mixer liner and the mixing blade of 50m3 concrete mixing plants are specially treated, and the special shaft end support and sealing type greatly improve the service life of the main machine. It adopts the method of hoisting and lifting the hopper to load the material. The special design of the hopper and the track can conveniently and efficiently hold and dump the aggregate, and greatly reduce the area occupied by the site. It only takes a few hours for the main body system of the mixing station to be unloaded from the conveyor to be installed. The whole installation work can be completed in two to four days along with the installation of other supporting equipment such as the control room and the batching station. The mixing platform, metering platform and lifting system platform are sturdy and durable, which fully guarantees the needs of calibration, inspection and maintenance equipment. When exterior protection is needed, there is still plenty of room for everyday work.